Environmental Compliance Services for the
Upper American River Project & Chili Bar Project

For more than two decades, Stillwater Sciences has supported SMUD with environmental assessment and compliance for the UARP and the Chili Bar Project. Stillwater continues to conduct studies throughout the UARP and Chili Bar Project areas and areas surrounding Eldorado National Forest and BLM land in support of support planning, design, and construction projects and operational requirements. Select project experience is described below:

Preconstruction Surveys: Over the years, Stillwater biologists have performed extensive pre-construction surveys, worker awareness trainings, and biological monitoring for SMUD maintenance and improvement projects, including bat surveys (e.g., SMUD’s Jones Fork Powerhouse), fish rescue and relocations (e.g., Jones Fork Powerhouse, Robbs Peak Forebay), giant garter snake and western pond turtle monitoring (e.g., Dead Horse Island), and nesting bird surveys (e.g., Union Valley Reservoir, Ice House Reservoir).

Geomorphology Studies: As part of the license application process for the UARP, Stillwater scientists identified the most likely geomorphic response reaches downstream of project reservoirs based on Level 1 surveys and conducted detailed field surveys to assess geomorphology for 16 study sites. Measurements included channel morphology (cross sections and longitudinal profile), grain-size distribution, sediment facies, and bank and bed condition and where necessary pool filling by fine sediment. Stillwater surveyed 7 sites in the UARP and analyzed geomorphic changes between the 2002 and 2019 surveys, including changes to bed size distributions, sediment facies, and channel morphology.

Water Quality Studies: Since 2017, Stillwater scientists have conducted both in situ and laboratory analysis of water quality parameters at 19 streams and 15 reservoir sites throughout the UARP. These samples were collected to ensure compliance with beneficial use standards for water quality specified in the license. Monitoring, conducted throughout the year, includes turbidity sampling, water chemistry sampling, and bacterial monitoring at recreation areas and remote sites throughout the project area. The in situ water quality measurements are obtained during spring, summer, fall, and winter using a multi-probe Sonde. Measurements included turbidity, water temperature, conductivity, dissolved oxygen, and pH. At each reservoir, scientists collected a vertical water column profile at 1-meter depth intervals for all in situ parameters and measured Secchi depth. Water chemistry collected as grab samples were analyzed for 52 separate chemical constituents or analytes. In addition, bacteria samples were collected near reservoir and river shorelines in shallow water and, in particular, at swim areas/beach locations. Stillwater Sciences annually evaluates monitoring results to determine whether quality in the UARP study area is consistent with Basin Plan water quality objectives.

Effects of Integrated Vegetation Management on Plant Diversity: Stillwater collaborated with the Pollinator Partnership and Sacramento State University to investigate the potential effects of integrated vegetation management on species diversity (flora and fauna) and pollinator habitat within SMUD’s right-of-way corridors. The goal of the study was to collect multiple years of data within areas managed using different strategies (i.e., mechanical, herbicide, prescribed burning, grazing, and untreated) to compare species diversity; native and non-native plant distribution (with particular attention to special-status plants and invasive species); plant-pollinator relationships; and other environmental dynamics across these vegetation management strategies. Stillwater conducted all the botanical aspects of the study with findings synthesized with other study elements (e.g., pollinator frequency and diversity studies, plant-pollinator interactions) to inform effects of various right-of-way vegetation management strategies on ecosystem health and biodiversity.

LOCATION
El Dorado and Sacramento Counties, California
CLIENT
Sacramento Municipal Utility District (SMUD)
Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from - Youtube
Vimeo
Consent to display content from - Vimeo
Google Maps
Consent to display content from - Google